Appendix A · Timeline

Every dated entry below is anchored to the program’s ledger, its git history, or a filed record. The pre-repository months are narrated without invented specifics.

DateEvent
Nov 2025Lease executed on the property; the main building is let to the operating tenant. The rear structure and a slice of the lot are outside the leased premises.
Jan 2026Possession and fixturing begin under the new tenancy.
Spring 2026Concept work begins on what the site's unleased remainder could carry. The pre-repository months are concept phase; no artifacts survive from them, and none are invented here.
2026-04-30Founding commit of the software platform.
2026-05-13The walk-in register ships: cash and card ring-up, end-of-day closeout.
2026-05-25Strategy pivots register-first; two days later the posture hardens to no partial rollout, test to destruction before any real user.
2026-05-28The payments spine lands in one long day: processor onboarding, terminal simulator, admin authentication with an append-only audit log, and the first chaos harness.
2026-06-03 to 06-09Edge hardware spike: a 3B language model and speech-to-text co-resident on an 8 GB edge computer; voice under the 4-second bar for the common case. Validated, then deliberately parked.
2026-06-10The bulletproofing capstone: two-phase terminal refunds, the reconciliation backstop, and the 48-check destruction pass. All scenarios held.
2026-06-12All money paths verified live on deployed infrastructure, test mode, end to end.
2026-06-30The unattended loop ships: session, charge-on-exit, inventory decrement, receipt.
2026-07-06First full bench proof on physical hardware: a real session rung up and closed by a single-board computer driving a real lock, still test mode.
2026-07-09First live dollar: a $1.99 phone-wallet purchase charged on production rails and refunded through the same system.
2026-07-13The practice's doctrine is written down. The drink program is specified to the fastener: hypothesis, seven kill criteria, market calendar, machine assessment, buildout bill of materials. The staffed variant is rejected the same day.
2026-07-14The evidence closes the question: the category autopsy and its measured demand ceiling (chapter 03), the landed-cost falsification (chapter 05), the total-capital arithmetic against the 24-month kill line (chapter 07), and the category's own record of better-funded operators who lost (appendix D). All venue lines are closed. The record is filed the same day. The circulation finding (chapter 08) lands the same week: a bound on one structure, not a cause.